Project delivery & lifecycle

Engineering that continues after commissioning.

A line is a long-term asset. Our process covers the full sequence — consultation, 3D engineering, fabrication, factory testing, installation and the support that follows.

Delivery sequence

  1. 01

    Line Consultation & Needs Assessment

    Our senior industrial engineers examine your packaging specifications, viscosity, bottle geometry, factory layout, and target hourly output to define the optimal line configuration and budget.

  2. 02

    3D Mechanical & Electrical Engineering

    We create full 3D layout simulations, material flow diagrams, and custom electrical schematics using advanced CAD/CAM software to optimize footprint before any steel is cut.

  3. 03

    Precision In-House Manufacturing & FAT

    All machinery chassis, conveyor tracks, and electrical panels are fabricated at our 10th of Ramadan City plant with rigorous Factory Acceptance Tests (FAT) using your actual containers.

  4. 04

    Site Installation, SAT & Commissioning

    Experienced Al Sakr engineering crews handle mechanical anchoring, electrical wiring, PLC network tuning, and real production-speed Site Acceptance Testing (SAT) on your factory floor.

  5. 05

    Operator Training & Lifetime Technical Support

    Comprehensive hands-on training for your operators and maintenance staff, paired with direct rapid-response field support and scheduled preventive maintenance visits.

After commissioning

Support is handled directly by the engineers who built the line — not routed through a third-party service network.

Spare parts catalogues are not published. Service and replacement components are handled directly by our engineering team.

  • 12-month mechanical and electrical warranty
  • Operator and maintenance team training
  • Scheduled preventive maintenance visits
  • Rapid field response from our Egyptian engineering team
  • FAT and SAT documentation, electrical schematics and manuals

Service questions

Are your machines and conveyor systems designed and manufactured in Egypt?+

Yes. Al Sakr Top Group operates a dedicated manufacturing and assembly facility in Industrial Area C3, 10th of Ramadan City, Egypt. We perform all mechanical engineering, CNC fabrication, electrical panel assembly, and testing in-house according to strict international industrial standards.

Can you provide a complete turnkey production line from filling to palletizing?+

Absolutely. Turnkey line engineering is our core specialty. We synchronize liquid filling, capping, sleeve/label application, cartoning, flexible conveying networks, spiral elevators, and robotic palletizing into a balanced, single-supplier integrated system.

What materials and automation standards do you use in your equipment?+

We construct all frames from sanitary AISI 304 stainless steel or anodized industrial aluminum, with AISI 316L for liquid-contact parts in food and pharmaceutical lines. Automation features touch-screen PLC controllers, precision servo drives, and optical sensors.

How long does a typical custom machine or conveyor project take to deliver?+

Individual machines and standard conveyor modules are typically delivered within 3 to 6 weeks. Complete turnkey production line installations usually range from 8 to 14 weeks from approved 3D layout to factory floor commissioning.

What after-sales service and warranty do you provide?+

We provide a comprehensive 12-month mechanical and electrical warranty, coupled with on-site operator training, Factory Acceptance Testing (FAT), and scheduled preventive maintenance service visits from our Egyptian engineering team.

Need a line audited or upgraded?

We can review an existing line, identify bottlenecks and engineer the upgrade around your production window.

Book a technical review